1. Skip to content

The Path from the Mill-site to the weir.

The Path from the Mill-site to the weir.

The path from the mill-site to the weir is the old tow path. The weir drains off water from the river so that the water level in the canal stays more or less constant. The original bridge over the weir fell down in 1971. It was replaced in 1999.